DESIGN AND CONSTRUCTION OF INDUSTRIAL WASTEWATER TREATMENT PLANT AT SES MEGALOPOLIS – UNITS I, II, III

CONTRACT VALUE
4.450.000€
CONTRACT DURATION
19.6.2003 – 06.06.2008

Complete system for the treatment of industrial waste water generated by the operation of the three Units (I, II and III) and the Auxiliary Facilities of the Megalopolis Power Station, as well as the rainwater collected from the Power Plants’ facilities and areas, in order to meet all the requirements of the Legislation for the disposal of treated waste water in the river Ligatari.