Pancretan National Stadium
Contract value
49.495.524,00 €
Contract period
9/2001-3/2004
Design and build of the main Stadium. Provision of all facilities required to stage Olympic events like press area, VIP lounges, managerial areas, cafeterias etc.
Additional facilities consisting of a football pitch, a track of Olympic specifications, lighting poles and changing rooms for the athletes.
-Total built area 62,000m² – Seating capacity 30,000 spectators in 20 sections