DESIGN AND CONSTRUCTION OF ATHENS WASTEWATER TREATMENT PLANT IN PSYTTALIA (PHASE A’)
CONTRACT VALUE
52.300.000€
CONTRACT DURATION
1987 - 1998
Design-Construction of Pre-Treatment Works (Lift Pumping Station with Archimedes screws, screening, sand removal), Primary Sedimentation Tanks, Pre-Thickening, Post-Thickening, Digestion, Gas holders, Sludge Dewatering, Instrumentation & SCADA.
Perform a test run, commissioning, 12 months operation.
Plant capacity 750.000 m3/day with anticipation for 1.000.000 m3/day for an equivalent population of 3.000.000 inhabitants