IGB Project (Gas Interconnector Greece-Bulgaria)

CONSTRUCTION COST
145,000,000 €
CONSTRUCTION PERIOD
2019 – in progress

The IGB Project (Gas Interconnector Greece-Bulgaria).

The IGB gas pipeline will be connected with the Greek national gas transmission system in the area of Komotini and with the Bulgarian national gas transmission system in the area of Stara Zagora. The planned length of the pipeline is 182 km, the pipeline diameter will be 32″ and the projected capacity will be up to 3 bcm/y in the direction from Greece to Bulgaria. Depending on the interest from the market and the capacities of the neighboring gas transmission systems, the pipeline is designed for increasing its capacity up to 5 bcm/y.