DESIGN AND CONSTRUCTION OF SLUDGE DRYING PLANT AT PSYTTALIA WASTEWATER TREATMENT PLANT
CONTRACT VALUE
€ 37.350.000
CONTRACT DURATION
2006 - 2008
The Unit consists of four (4) parallel drying lines with rotating drums.
Each drying line has an evaporation capacity of 8,625 KgH2O / h with a maximum capacity of 9,200 KgH2O / h.
Nominal dehydration capacity at 4 * 250tnDS / day, with 20% -32% DS sludge concentration.
The final product, “dried sludge”, is collected in four (4) Storage Silos