COGENERATION UNITS OF ELECTRICAL AND THERMAL ENERGY PRODUCTION FROM BIOGAS COMBUSTION AT PSYTTALIA WASTEWATER TREATMENT PLANT – (A370)

CONTRACT VALUE
€ 15.113.000
CONTRACT DURATION
1998 - 2003

Design / Construction of 7.125 MW electricity and thermal power cogeneration plants from biogas combustion, three (3) biogas engines with a capacity of 1.000m3/h, fully automated control system with SCADA system, biogas purification system (5,000m3/h), three (3) gas compressors 110KW each with a capacity of 1.025Nm3/h & pipeline works and digester district heating network