Egnatia Toll Road [Anthohori-Metsovo Section]

Contract value
189.056.191,00 €
Contract period
10/1999 – 09/2005

Construction of a two-way motorway 5.8 km long, including five twin tunnels 7.400m in total length and two bridges 1.920 m in total length.

Search: